01
Quantity take-offs
Pipe, structures, excavation, bedding, backfill and restoration measured from IFC drawings and reconciled against the pay items.
Estimating · Vancouver, BC
Quantity take-offs and technical estimates for sanitary, storm and water mains, gas pipelines, substations and roadworks, built from the drawings and priced from production rates.
What I deliver
01
Pipe, structures, excavation, bedding, backfill and restoration measured from IFC drawings and reconciled against the pay items.
02
Rates built from crew productivity and benchmarks, with every assumption visible and traceable.
03
Contractor pay quantities checked against field records and the contract schedule of quantities.
04
Bid evaluation support, change order pricing and T&M tracking against the original estimate.

How I work
Relevant experience
Questions
Civil and utility infrastructure: sanitary, storm and water mains, manholes and services, gas pipelines, substation civil works, earthworks, roadworks, paving and restoration.
Yes. Take-offs follow the MMCD Platinum Edition measurement and payment sections and the municipal supplementary specifications for the project, or the BC MoTI Standard Specifications on highway work.
Metro Vancouver and British Columbia. He is based in Vancouver and registered as an Engineer in Training with Engineers and Geoscientists BC.
Email goudarzi.hamid@gmail.com with the drawings, specifications and the scope you need priced.