Hamid Goudarzi

Construction technologist in civil and utility infrastructure.

  1. Step 1 of 5

    From IFC set to field scope.

    Civil drawings, specifications, elevations and grades, redlined into clear direction for crews before the first bucket digs.

  2. Step 2 of 5

    Every metre accounted for.

    Sanitary, storm and water take-offs, pay quantities and material tracking, checked against the drawings.

  3. Step 3 of 5

    Estimates built on production.

    Technical estimates for civil and structural scopes, based on construction drawings and productivity benchmarks.

  4. Step 4 of 5

    Crews, trucks and inspectors in sequence.

    Excavation, pipe, backfill, compaction testing and paving, coordinated with subcontractors, suppliers and inspectors.

  5. Step 5 of 5

    No surprises at closeout.

    RFIs, change orders, T&M reports and as-builts keep scope and budget documented from start to finish.

Most of what I build ends up underground. I read the drawings, count what's in them, price it, and keep the job on budget. When the tools fall short, I build better ones.

Trace a pipe run.
Get the numbers.

A working utility take-off, written from scratch for this site. Draw your own run along the street and watch the quantities update.

70 m70 m40 m40 m

Run finished. Change the trench or the rate to update the numbers.

Pipe length
220 m
Manholes
5
Excavation
660 m³
Bedding
79 m³
Pipe cost at this rate$132,000

A demo with a sample rate, not a quote. Bedding assumes 300 mm under the pipe.

An estimating agent
you can try.

This is how I think AI belongs on a civil job: it reads the scope, shows its assumptions, and leaves the decision with a person. Type a scope and watch the workflow.

  1. Read the scopeStorm main, 220 m long
  2. Take off quantities792 m³ excavation, 79 m³ bedding, 4 manholes
  3. Check assumptionsNothing missing from the scope
  4. Apply production ratesAbout 30 m per crew day, 11 crew days
  5. Draft the estimate$193,502 before review
ItemQtyRateTotal
Storm main, 300 mm220 m$300$66,000
Trench excavation792 m³$56$44,352
Pipe bedding79 m³$70$5,530
Manholes4 ea$10,000$40,000
Asphalt restoration396 m²$95$37,620
Draft total$193,502
Crew days11

A demo of the workflow, using simple rules that run in your browser and sample rates. No live AI model, and not a quote.

A scheduled AI agent also checks this website each week and proposes improvements for my approval.

Experience.

Jul 2023 to now

Neil Smith Construction Ltd.

Construction Technologist, Vancouver, BC

  • Coordinate field operations and project documentation for civil infrastructure, utility, school and site development projects across Metro Vancouver
  • Support civil utility installation: sanitary, storm and water systems
  • Support earthworks, excavation, backfilling and grading, plus roadworks, asphalt paving, curbs, sidewalks and restoration
  • Coordinate crews, equipment, trucking, material deliveries, subcontractors and suppliers
  • Coordinate compaction and asphalt density testing
  • Handle quantity tracking, material take-offs and cost monitoring
  • Manage RFIs, change orders, T&M reports, purchase orders and project documentation
  • Read civil drawings, specifications, elevations and grades, and support superintendents and project managers to keep work on schedule

Apr 2021 to Jun 2023

FortisBC

Construction Technologist, Infrastructure and Utility Projects, Vancouver, BC

  • Contributed to planning and field execution of multi-million-dollar upgrades involving gas transmission pipelines and electrical substations
  • Developed technical estimates and quantity take-offs for civil and structural scopes using construction drawings and productivity benchmarks
  • Reviewed engineering deliverables and facilitated redline markups and field clarifications for constructability and accuracy
  • Coordinated material staging, crew scheduling, inspection readiness and safety documentation
  • Managed field data collection and progress reporting, and analyzed schedule impacts and site constraints
  • Prepared QA/QC records, as-built packages and compliance checklists
  • Provided field support for concrete works, underground conduit installation and substation foundations

May 2020 to Apr 2021

SNC-Lavalin

Project Coordinator, Civil and Public Infrastructure, Montreal, QC

  • Supported coordination and documentation for large-scale infrastructure programs, including transit corridor upgrades and highway redevelopment
  • Liaised between civil designers, general contractors and municipal inspectors to resolve design queries and field modifications
  • Oversaw submission workflows for shop drawings, permit applications and change orders
  • Participated in site walks, tracked progress against milestones and generated status updates
  • Verified contractor pay quantities and supported procurement documents, bid evaluations and closeout documentation

Apr 2021 to Sep 2023

Bare Advertising & Communications

Full Stack Developer, Vancouver, BC (remote)

  • Built responsive interfaces with React, Next.js, JavaScript and Tailwind CSS on projects including Real Cedar and ECAD Labs' Taquito.io
  • Developed backend functionality with Python and integrated REST and GraphQL APIs
  • Developed custom WordPress themes and integrated headless CMS platforms such as Strapi

What I bring to a project.

Cost estimation.

Quantity take-offs, fixture counts, cost control and T&M tracking for civil work.

  • Trenches and pipe
  • Fixtures and materials
  • Cost control

Scheduling in Primavera P6.

Certificate in scheduling and cost control from Civil House.

Example schedule

Utility coordination.

  • IFC drawings
  • RFIs
  • Permits
  • Inspections
  • Field documentation

Software development.

React, Next.js, Python, SQL and API integration. This is the length formula behind the take-off above.

const length = pts.slice(1).reduce((sum, p, i) =>
  sum + Math.hypot(p.x - pts[i].x, p.y - pts[i].y), 0);
const excavation = length * width * depth;

Daily tools.

  • Procore
  • Bluebeam
  • AutoCAD
  • Primavera P6
  • Excel

M.Eng.

Civil Engineering, Concordia University.

B.Sc. in Civil Engineering, Azad University. EIT with Engineers and Geoscientists BC.